- CHAPTER 1 SCOPE [Go to Page]
- 1.1 SCOPE
- 1.2 WHAT IS THE PURPOSE OF INSPECTION?
- 1.3 WHAT IS THE VALUE OF INSPECTION?
- 1.4 WHAT IS THE COST OF INSPECTION?
- 1.5 DOES THE TIMING OF INSPECTIONS AFFECT CONSTRUCTION COSTS?
- 1.6 WHAT RISKS ARE INVOLVED WHEN INSPECTIONS ARE NOT DONE OR ARE NOT DONE PROPERLY?
- 1.7 WHAT QUALIFICATIONS ARE NEEDED BY INSPECTORS?
- 1.8 HOW DO I USE THIS GUIDE?
- 1.9 DUCT INSPECTIONS OVERVIEW
- CHAPTER 2 COMPLIANCE AND QUALITY CONTROL [Go to Page]
- 2.1 COMPLIANCE AND QUALITY CONTROL
- 2.2 CHECKLISTS
- APPENDIX A FUNCTIONS OF DUCTED AIR HANDLING SYSTEMS [Go to Page]
- A.1 VENTILATION AND AIR CONDITIONING
- A.2 CENTRAL AIR HANDLING SYSTEM
- A.3 DEDICATED EXHAUST SYSTEMS
- A.4 ROOM AIR DISTRIBUTION
- A.5 ROOM PRESSURE CONTROL
- A.6 INFILTRATION AND EXFILTRATION
- A.7 CENTRAL ALARM CONTROL STATIONS
- A.8 TESTING AND BALANCING
- A.9 SYMBOLS
- FIGURE A-1 SYMBOLS FOR HVAC SYSTEMS
- FIGURE A-1M SYMBOLS FOR HVAC SYSTEMS (METRIC)
- FIGURE A-2 SINGLE DUCT SYSTEM
- FIGURE A-3 TERMINAL REHEAT SYSTEM
- FIGURE A-4 MULTI-ZONE SYSTEM
- FIGURE A-5 VARIABLE VOLUME SYSTEM
- FIGURE A-6 DUCT SYSTEM EXAMPLE
- FIGURE A-6M DUCT SYSTEM EXAMPLE (METRIC)
- FIGURE A-7 DUCT PRESSURE CLASS DESIGNATION
- APPENDIX B DUCT CONSTRUCTION MATERIALS [Go to Page]
- B.1 GALVANIZED STEEL
- B.2 CARBON STEEL (BLACK IRON)
- B.3 STAINLESS STEEL
- B.4 ALUMINUM
- B.5 COPPER
- B.6 FIBERGLASS REINFORCED PLASTIC (FRP)
- B.7 POLYVINYL CHLORIDE (PVC)
- B.8 POLYVINYL STEEL (PVS)
- B.9 CONCRETE
- B.10 ASBESTOS CEMENT
- B.11 RIGID FIBROUS GLASS
- B.12 GYPSUM BOARD
- Table B-1 Galvanized Sheet Thickness Tolerances
- Table B-2 Manufacturers Standard Gage-Thickness (Uncoated Steel)
- Table B-3 Stainless Steel Sheet Thickness
- Table B-4 Aluminum Sheet Thickness (Alloy 3003-H14))
- APPENDIX C HVAC DUCT CONSTRUCTION STANDARDS [Go to Page]
- C.1 DUCT CONSTRUCTION AND INSTALLATION STANDARDS
- C.2 DUCT SEALING COMMENTARY
- C.3 RECTANGULAR DUCT REINFORCEMENT
- C.4 INTRODUCTION TO THE RECTANGULAR DUCT CONSTRUCTION SCHEDULES
- C.5 TRANSVERSE JOINTS FOR RECTANGULAR DUCT
- C.6 VOLUME DAMPERS (NOTES FOR FIGURES C-15 AND C-16)
- C.7 COMMENTARY
- C.8 SPECIFICATION FOR SUPPORTING FLEXIBLE DUCT
- C.9 ROUND DUCT CONSTRUCTION STANDARDS
- C.10 COMMENTARY
- C.11 CASING AND PLENUM CONSTRUCTION STANDARDS
- Table C-1 Standard Duct Sealing Requirements
- Table C-2 Rectangular Duct Reinforcement
- Table C-2M Rectangular Duct Reinforcement
- Table C-3 Unreinforced Duct (Wall Thickness)
- Table C-3M Unreinforced Duct (Wall Thickness)
- Table C-4 Intermediate Reinforcement
- Table C-4M Intermediate Reinforcement
- Table C-5 Transverse Joint Reinforcement
- Table C-5M Transverse Joint Reinforcement
- Table C-6 Transverse Joint Reinforcement
- Table C-6M Transverse Joint Reinforcement
- Table C-7 Mitered Elbows
- Table C-8 Round Duct Gage Unreinforced Positive Pressure
- Table C-8M Round Duct Gage Unreinforced Positive Pressure
- Table C-9 Rectangular Duct Hangers Minimum Size
- Table C-9M Rectangular Duct Hangers Minimum Size
- Table C-10 Minimum Hanger Sizes for Round Duct
- FIGURE C-1 DEPENDENT VARIABLES
- FIGURE C-2 READING GUIDE SUMMARY
- FIGURE C-3 UNREINFORCED DUCT
- FIGURE C-4 CROSSBROKEN AND BEADED DUCT
- FIGURE C-5 FLEXIBLE DUCT LINER INSTALLATION
- FIGURE C-6 LINER FASTENERS
- FIGURE C-7 DUCT REINFORCED ON TWO SIDES
- FIGURE C-8 REINFORCEMENT ATTACHMENT
- FIGURE C-9 RECTANGULAR DUCT/TRANSVERSE JOINTS
- FIGURE C-9 RECTANGULAR DUCT/TRANSVERSE JOINTS (CONTINUED)
- FIGURE C-9 RECTANGULAR DUCT/TRANSVERSE JOINTS (CONTINUED)
- FIGURE C-9 RECTANGULAR DUCT/TRANSVERSE JOINTS (CONTINUED)
- FIGURE C-10 RECTANGULAR DUCT/LONGITUDINAL SEAMS
- FIGURE C-11 RECTANGULAR ELBOWS
- FIGURE C-11 RECTANGULAR ELBOWS (CONTINUED)
- FIGURE C-12 VANES AND VANE RUNNERS
- FIGURE C-13 VANE SUPPORT IN ELBOWS
- FIGURE C-14 BRANCH CONNECTION
- FIGURE C-15 VOLUME DAMPERS - SINGLE BLADE TYPE
- FIGURE C-16 MULTIBLADE VOLUME DAMPERS
- FIGURE C-17 OFFSETS AND TRANSITIONS
- FIGURE C-18 REMOTE HEATING AND COOLING COIL INSTALLATIONS
- FIGURE C-19 CEILING DIFFUSER BRANCH DUCTS
- FIGURE C-20 FLEXIBLE DUCT SUPPORTS
- FIGURE C-21 FLEXIBLE DUCT SUPPORTS
- FIGURE C-22 ROUND DUCT TRANSVERSE JOINTS
- FIGURE C-22 ROUND DUCT TRANSVERSE JOINTS (CONTINUED)
- FIGURE C-23 ROUND DUCT LONGITUDINAL SEAMS
- FIGURE C-24 HANGER ATTACHMENTS TO STRUCTURES
- FIGURE C-25 UPPER ATTACHMENT DEVICES - TYPICAL
- FIGURE C-26 LOWER HANGER ATTACHMENTS
- FIGURE C-27 RISER SUPPORTS - FROM FLOOR
- FIGURE C-27M RISER SUPPORTS - FROM FLOOR
- FIGURE C-28 ROOFTOP DUCT INSTALLATION
- FIGURE C-29 EQUIPMENT AND DUCT SUPPORT FLASHING
- FIGURE C-30 RECTANGULAR GOOSENECK
- FIGURE C-31 BUILT-UP STANDING SEAM CASING
- FIGURE C-32 DISHWASHER VAPOR EXHAUST
- APPENDIX D FIRE, SMOKE, AND RADIATION DAMPER GUIDE [Go to Page]
- Table D-1 Recommended Fire Damper Installation Instructions
- Table D-2 Recommended Minimum Sleeve Thickness for Fire Dampers*
- FIGURE D-1 BASIC FIRE DAMPER INSTALLATION DETAILS
- FIGURE D-2 UL DUCT-SLEEVE CONNECTIONS (BREAKAWAY CONNECTIONS)
- FIGURE D-2 UL DUCT-SLEEVE CONNECTIONS (BREAKAWAY CONNECTIONS) (CONTINUED)
- FIGURE D-3 FIRE DAMPER OPENING PROTECTION
- FIGURE D-4 CURTAIN FIRE DAMPERS
- FIGURE D-5 COMBINATION FIRE AND SMOKE DAMPERS
- FIGURE D-6 DUCT LINER INTERRUPTION
- FIGURE D-7 ACCESS DOORS AND PANELS
- FIGURE D-8 LEAKAGE RATED (SMOKE) DAMPER
- FIGURE D-9 FIRE RATED CEILING ASSEMBLIES
- APPENDIX E FIBROUS GLASS DUCT CONSTRUCTION [Go to Page]
- E.1 FIBROUS GLASS DUCT CHARACTERISTICS AND LIMITATIONS
- E.2 CLOSURES
- E.3 ADDITIONAL FIBROUS GLASS DUCT CONSTRUCTION DETAILS
- Table E-1 Tie Rod System Reinforcement Schedule
- Table E-1M Tie Rod System Reinforcement Schedule
- Table E-2 Channel System Reinforcement Schedule
- Table E-2M Channel System Reinforcement Schedule
- Table E-3 Partial Wrap-around Reinforcement Schedule
- Table E-3M Partial Wrap-around Reinforcement Schedule
- Table E-4 Maximum Hanger Spacing by Duct Size, I.D.
- Table E-5 Channel Selection
- FIGURE E-1 TAPE CLOSURE JOINT, WITH STAPLE FLAP
- FIGURE E-2 TAPE CLOSURE JOINT, WITHOUT STAPLE FLAP
- FIGURE E-3 CLOSURES (CONTINUED)
- FIGURE E-4 TIE ROD REINFORCEMENT AT JOINT
- FIGURE E-5 SHEET METAL AND EQUIPMENT CONNECTION DETAILS
- FIGURE E-6 SHEET METAL AND EQUIPMENT CONNECTION DETAILS (CONTINUED)
- FIGURE E-7 TIE ROD REINFORCEMENT
- FIGURE E-7M TIE ROD REINFORCEMENT
- FIGURE E-8 TIE ROD TERMINATION METHODS
- FIGURE E-9 CHANNEL REINFORCEMENT, POSITIVE PRESSURE SYSTEMS
- FIGURE E-10 CHANNEL REINFORCEMENT, NEGATIVE PRESSURE SYSTEMS
- FIGURE E-11 PARTIAL WRAP-AROUND REINFORCEMENT
- FIGURE E-11M PARTIAL WRAP-AROUND REINFORCEMENT
- FIGURE E-12 ALLOWABLE HANGER SPACING, STRAIGHT DUCT " 3 INCH WIDE CHANNELS
- FIGURE E-13 HANGER SPACING AND EXTENSION " 3 INCH WIDE CHANNELS
- FIGURE E-14 USE OF 2 INCH WIDE HANGER CHANNELS
- FIGURE E-15 ACCESS DOOR, FLANGE ON OPENING [Go to Page]